Introducing the Headway 3M Framework

12 Steps Series – 4 of 12
Executive Summary
Projects succeed when they deliver a set of measurable results that together solve the business problems defined earlier in the Outcomes steps.
The trouble is that once delivery gets hectic, teams slip into tracking effort, spend, and milestones instead of proximity to the Outcome. Different people quietly carry different definitions of “success”, so progress reports become a mix of partial stories rather than evidence.
The 3M framework (Measure, Measurement, Method) is a simple way for practitioners to turn each Result into something they can unambiguously observe, track and discuss.
How to Measure Things
Look at the person in the picture, concentrating on adding half a cup of water.
They’re serious. They’re focused. They’re also using a ruler!! They are measuring, but there’s no version of this story where they’re going to get the right answer.
Sometimes projects look like this. Teams work hard, track dozens of numbers, produce thick status packs – and still can’t say with confidence whether they’re any closer to the Outcome the organisation cares about.
You see it in steering packs full of:
– RAGs on tasks and milestones
– Counts of workshops, tickets, or training sessions
– S-curves of spend and effort

None of these are bad things to know. The problem is they’re all about the project activities, not about the results. It’s like carefully marking millimetres on the side of the glass while ignoring the simple question: “Is there actually half a cup of water in here?”
The Headway 3M Framework is about putting the ruler down and picking up a proper measuring cup.
Introduction to the Headway 3M Framework
To make this concrete, imagine a very simple Outcome:
“We need the car to go faster.”
Everyone is happy with that. It sounds decisive and ambitious. You can even picture the slide (It probably even has a red arrow on it). But if we leave it there, we’ve created perfect conditions for the ruler-and-water problem. One person will say, “It feels quicker.” Another will point proudly at the new spoiler. A third will mention, for the fifth time, how hard the team has worked.
The 3Ms give us a way to pin this down:
- Measure – What’s the real thing we care about?
- Measurement – How exactly will we express it?
- Method – How will we actually collect the data?
Let’s walk through each of them
1. Measure – What’s the real thing we care about?
First, we name the Measure.
For a “faster car”, the obvious Measure is Speed.
That sounds almost insultingly simple, but it’s the moment you decide what game you’re playing and what you are actually interested in.
You are not measuring:
– Number of modifications made
– Hours the mechanics worked
– Size of the engine
– Number of steering committee nods
– No of people who have complimented the car on LinkedIn

So, the first discipline of the 3Ms is to ask, for each Result you want to achieve:
“What is the real thing we care about here?”
For the car, it’s speed. For your project, it might be response time, defect rate, first-contact resolution, staff turnover, conversion rate, or something similar. Name it plainly.
When Measure is vague or missing, projects slide into defaulting to what’s easiest to count. You end up with immaculate reporting on activity – and an organisation that can’t point to a meaningful outcome. Measure forces you to distinguish results from activity.
It keeps you anchored to the thing that actually matters for the Outcome, not the things that are simply visible.
2. Measurement – How exactly will we express it?
Once we know the Measure is speed, we still haven’t said how we’ll express it.
There’s lots of different ways to express speed.
That’s the Measurement.
Speed could be:
– kilometres per hour (km/h)
– miles per hour (mph)
– metres per second (m/s)
– nautical miles per hour (knots) – handy if your car is a boat
– or, if someone in the team did a physics degree, “as a fraction of the speed of light”
– or, for the sci-fi fan in the corner, “number of parsecs per Kessel Run”

All of these technically relate to “how fast”. Not all are remotely useful in this context.
This is what happens in projects when we never nail the Measurement. Everyone nods when we say, “We’ll increase adoption.” But:
- One stakeholder is thinking “percentage of users who log in weekly”
- Another is silently assuming “total licences sold”
- A third is going on gut feel: “My team doesn’t complain about it anymore, so adoption must be high”
Same Measure, completely different Measurements.
So, we must choose something concrete:
“Average speed in km/h over a 5 km test track.”
Now “faster” has a shared meaning. Nobody is quietly doing mental conversions in mph or, worse, “I reckon it looks quicker from the grandstand”.
In project terms, we might say:
“Adoption = percentage of eligible users who performed [key action] at least once in the last 30 days, by business unit.”
Measurement is the expression used to determine whether the Result has been achieved.
Its purpose is to kill-off competing definitions of “success”.
It gives you a shared language. Everyone knows whether we’re talking km/h, mph, or “my subjective sense of speed when I’m in the passenger seat gripping the door handle”.
3. Method – How will we actually collect the data?
We still have one step left: the Method.
Knowing we want km/h over 5 km is good. But how will we actually get the number?
For our car, possible Methods include:
- Reading the car’s speedometer
- Using GPS tracking
- Setting up a radar gun beside the track
- Timing the car over 5 km with a stopwatch and doing the calculation
- Hooking the car up to a testing rig with all sorts of telemetry (for the data-hungry among us)

Each Method will give slightly different numbers. Some are more accurate, some are easier to use, some are more practical to repeat. But if you don’t explicitly choose one upfront, you’ll eventually discover that everyone comes up with their own:
– Two teams arrive with different figures for “the same” Measure
– Someone spends half the meeting arguing that their data source is purer
– Another person quietly resolves never to trust the numbers again
– Or we avoid the conversation altogether (the path of least resistance)
So, for our car we might say:
“We will use GPS data from a calibrated device mounted in the car, averaged over three runs of the 5 km track.”
Unremarkable. Boring even. And that’s the point. When Method is explicit and dull, nobody has to fight about it.
In a real project, Method might cover:
– Which system or report the data comes from
– How frequently it’s pulled
– Who is responsible for producing it
– Where it’s stored and how it’s shared
It doesn’t need a thesis – just enough clarity that if someone new joined the team, they could reproduce the number without detective work.
Method stops data wars before they start.
It makes clear which numbers count and how they’re produced. You still need judgment, but you’re no longer arguing about whose spreadsheet is “more real”.
Bringing it back to your own projects
You don’t need to turn every project conversation into a formal 3M workshop. That would be its own kind of ruler problem.
But you can start listening for vague results:
– “Better engagement”
– “More streamlined process”
– “Higher quality data”
– “Faster response”
And gently test them with the 3Ms:
- Measure: What’s the real thing we care about?
- Measurement: How exactly will we express it?
- Method: How will we actually collect the data?
If any of those questions produces an awkward silence, or four different answers, you’ve just found a place where the project is still measuring water with a ruler.
Pause. Clarify. Pick up the measuring cup instead.
Because in the end, defining project measures with the 3M framework isn’t about adding more metrics. It’s about making sure when you measure, you’re doing it in a way that can actually tell you whether the car – and the organisation – is going faster. Because if you’re going to measure something, you may as well measure the thing that actually matters — not just the thing that fits neatly in a status report.
